Define the job before choosing the arm.

A useful automation brief starts with the process you want to improve. “We need a robot” leaves the most important questions open: what should change, what must stay the same, and how will the finished process be evaluated?

Start with a plain-language description of one complete task. Record the input, each handling or processing step, and the required output. Mark the steps you intend to automate and the work that will remain with an operator.

Plan the people as well as the process. In a NIST Manufacturing Extension Partnership article on first robot integrations, Matt Minner advises being honest about how much support and time a first project will need, and involving the people who own the current process, because small process inconsistencies can cause big problems in an automation project. The project planner gives that first description a structure.

Bring the range—not just the easiest part.

List the smallest and largest parts, their weights, the available gripping surfaces, and any differences between variants. Include the difficult parts in the conversation early.

A photograph can introduce a process, but dimensions, representative samples, and a short video usually make the next discussion more specific. Do not send confidential customer drawings through an unapproved channel.

Measure a complete cycle.

Write down loading, movement, process time, inspections, unloading, and any waiting or changeover steps. Label measured observations separately from targets and estimates.

This is a planning checklist, not a promised productivity improvement. The useful output is a shared definition of the cycle that the proposed solution must demonstrate.

Make the handoffs explicit.

Identify what equipment sits before and after the proposed cell. Ask who owns machine signals, part presentation, finished-part removal, error handling, and recovery.

Also assign responsibility for integration, tooling, commissioning, safeguarding, training, and ongoing support. A clear responsibility list helps make quotations comparable.

Put safety on that list from the start. OSHA’s robotics standards page notes that there are no OSHA standards specific to the robotics industry and points instead to general-industry rules and to consensus documents, including a task-based risk assessment method. Agree early who will assess your cell. The cobot risk assessment guide explains what that covers.

Agree on acceptance before discussing success.

Specify what a successful demonstration would include: representative part families, a complete cycle, defined quality checks, changeovers, and expected operator interactions.

Your first brief does not need to solve every engineering problem. It should expose the questions that need to be solved before a purchase commitment.

Automation projects in other industries already have words for this. IEC 62381:2024 defines factory and site acceptance tests, which demonstrate that an automation system meets its specification. A first cobot cell needs the same idea at a smaller scale: a written test, agreed before the order, that the supplier runs and you witness. The demo and acceptance test guide turns that into a checklist.

What to bring to the first conversation

  • A description or video of the complete current task.
  • Representative part dimensions, weights, and variation.
  • Measured current cycle and clearly labeled output targets.
  • A layout with access and surrounding equipment.
  • A list of required interfaces and proposed acceptance criteria.

Start with one application

If you are choosing where to begin, compare a machine-tending task with an end-of-line palletizing task: both are common first projects with clear inputs and outputs. When the list above is ready, request a consultation to work through it.

Sources and further reading