63 guides

Robot selection 5 min read

FAIRINO cobots: models, price and selection

Find a FAIRINO cobot for your application and budget. Compare model fit, published pricing, tooling, and integration, then prepare a complete quote request.

Planning 4 min read

Buying a robot: vendors, scope and support

Buying an industrial robot? Compare vendor scope, integration ownership, support, sample-part trials, and acceptance terms before choosing a complete cell.

Welding 4 min read

Welding cobot cost: budget and payback

Build a welding cobot budget covering fixtures, welding equipment, extraction, integration, training, and payback based on qualified production gains.

Getting started 3 min read

How to scope your first cobot project

A practical starting checklist for defining the process, parts, complete cycle, and acceptance criteria before requesting a robot quote.

Integration 4 min read

EtherCAT vs EtherNet/IP for robot cells

Compare EtherCAT and EtherNet/IP by installed controls, supported roles, timing requirements, and lifecycle support for your robotic cell.

Integration 4 min read

EtherNet/IP vs TCP/IP for robot buyers

Specify the application protocol, device roles, data map, and failure behavior when connecting a robot to your plant Ethernet network.

Integration 4 min read

GenICam for robot vision: what it solves

Use GenICam in a camera specification without assuming it guarantees image quality, software compatibility, or successful robot guidance.

Material handling 4 min read

AS/RS and robot cells: plan the handoff

Plan AS/RS and robot integration around load identity, delivery timing, transfer ownership, buffering, and recovery across warehouse and cell controls.

Material handling 4 min read

Robotic piece picking: test the SKU mix

Qualify robotic piece picking with an order-weighted SKU sample, real packaging variation, identity checks, exception handling, and measurable output.

Palletizing 5 min read

Case palletizing: design and quote the cell

Build a case palletizing specification covering carton handling, full pallet reach, line balance, pallet exchange, and production acceptance tests.

Palletizing 4 min read

Centralized vs end-of-line palletizing

Compare centralized and end-of-line palletizing using peak line demand, conveyor routes, buffer needs, failure impact, staffing, and expansion plans.

Palletizing 4 min read

Mixed-SKU palletizing: planning and buying

Plan mixed-SKU palletizing with usable product data, sequence rules, load-stability trials, recovery logic, and a clear division of software ownership.

Planning 4 min read

Automation benefits: build a business case

Build an automation business case around a measured production bottleneck. Compare capacity, labor, integration costs, and payback before requesting quotes.

Planning 4 min read

Manufacturing downtime: when a robot helps

Measure manufacturing downtime before buying automation. Build a loss log, identify recoverable time, and define robot-cell acceptance and recovery targets.

Robot selection 4 min read

Industrial robot vs cobot: a buying comparison

Compare industrial robots and cobots by payload, cycle time, operator access, tooling, and total cell cost. Use a practical checklist to evaluate proposals.

Vision 4 min read

2D vs 3D robot vision: a buying guide

Compare 2D and 3D robot vision by part presentation, height variation, and required decisions. Choose the simplest approach that passes your production test.

Vision 4 min read

Bin picking systems: a buyer’s checklist

Evaluate a bin picking system with real parts, difficult bin conditions, recovery rules, and sustained output instead of a short successful demonstration.

Vision 4 min read

Eye-in-hand vs eye-to-hand robot cameras

Compare wrist-mounted and fixed robot cameras by visibility, cycle time, payload, calibration, maintenance, and recovery before choosing your vision layout.

Vision 4 min read

Industrial 3D cameras: a selection checklist

Select an industrial 3D camera by usable volume, surface behavior, timing, mounting, and validated robot results. Build a sample-based comparison checklist.

Start with your process

Explore the application guides.

All applications

Bring the process.
Let’s talk about the next step.

Have an application in mind? Start with a conversation about the parts, the process, and what a useful solution needs to do.

Request a consultation